Ofgem heat network registration: the block
- What has changed
- Since 27 January 2026 Ofgem has regulated heat networks. A building where one heat source serves several flats is a communal heat network, and its operator must register with Ofgem by 26 January 2027.
- What it means for us
- If the block has a shared boiler, we are likely to be its operator. That means registering, following Ofgem’s consumer protection rules and reporting to Ofgem every quarter and every year.
- The proposal
- blockpath prepares and files the registration, drafts the policies Ofgem expects and files every return. We approve each one before it goes to Ofgem. We remain the operator and responsible for compliance.
- What it costs
- £650 once to register, then £59 a month at the founding rate, fixed for 12 months, and £79 after. For 20 flats that is about 68p per flat per week. The cost may be recoverable through the service charge, depending on the lease. Check with a solicitor if unsure.
- If nothing is done
- Ofgem can order an operator to comply, and can fine up to 10% of turnover or £1 million, whichever is higher. That is a ceiling, not what a typical block faces.
- Decision needed
- Approve registration of the block with blockpath, before 26 January 2027.
Prepared from information published by blockpath. blockpath is an independent service and is not affiliated with Ofgem. This note is general information, not legal advice.